Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 09/20/2018 | PLUMBING - ROUGH, SOIL | Correction Required | floor sink at west wall will be lowered to a level of 2 inches above finish floor. Clean out installed in 2 inch vent through the roof at the west wall. A water test will be made to the flood rim of the floor sinks. These items were thoroughly discussed with the plumber DAVID on site. Ran out of 2 part forms. |