Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 10/25/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ||
| 10/17/2018 | PLUMBING - INTERMEDIATE | Correction Required | Laundry, trap indoors not outdoors buried in the ditch, add a c/out for the drain line and a vent as required. #18 ha green tracer wire required at outdoor sewer line from end to end. Y and 1/8 bend or sweep required at 90’ ABS to clay sewer pipe change in direction. Test way C/out required at building to sewer line drain pipe |
|
| 09/14/2018 | PLUMBING - INTERMEDIATE | Partial Approval | MSc. call for drywall nailing inspection and relocate smoke detector outside of closet test required on all new waste and vent piping |
|
| 09/13/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 09/06/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ||
| 09/05/2018 | PLUMBING - INTERMEDIATE | Denied | west shower leaking on rough inspection, another failed inspection will result in a re-fee | |
| 09/04/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | THIS INSPECTION IS FOR ROUGH. LEAK AT EAST TOILET. RE-DO | |
| 08/28/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |