Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
| 07/24/2019 | PLUMBING - ROUGH, SOIL | Correction Required | Fill ABS completely with water for test. Copper coated green tracer taped or fastened to all drainage pipe outside the building. |
|
| 07/18/2019 | PLUMBING - ROUGH, SOIL | Denied | Plumbing is not complete. Missing 2nd bathroom. | |
| 07/17/2019 | PLUMBING - ROUGH, SOIL | Cancelled | IVRS - RI canceled |