Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2018 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 08/10/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- CAN NOT LOCATE A GAS LINE UNDER THE SLAB OR GROUND THAT IS UNDER THE STRUCTURE. 2- SHALL PROVIDE A AIR PRESSURE TEST ON THE ENTIRE SYSTEM. 3- SHALL PROVIDE ACCESS TO ALL GAS APPLIANCES INSIDE. 4- NOTE; THIS IS NOT A COMPLETE INSPECTION. * |
|
| 08/09/2018 | PLUMBING - GAS PRESSURE TEST | Denied | THERE IS NO TEST ON THE NEW GAS LINE. REQUIRED TEST IS 10 PSI FOR 15 MINUTES (MUST BE SEEN BY INSPECTOR) |