Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Gates locked, no one on site, no access | |
| 02/01/2019 | PLUMBING - INTERMEDIATE | Approved | Second attempt, owner there. Inspection complete and approved | |
| 01/31/2019 | PLUMBING - INTERMEDIATE | Correction Required | Second floor venting not per code. See notes from January 30, 2019 inspection | |
| 01/30/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall provide a 2 inch waste line for the clothes washer gray water waste line. 2- Shall install all second floor waste and soil lines as per the approved plans or Chapter 9 2012 IPC. 3- Shall provide non corrosion screws for securing the closet flanges. 4- Re test the DEV system. |
|
| 01/28/2019 | PLUMBING - INTERMEDIATE | Cancelled | ||
| 01/25/2019 | PLUMBING - INTERMEDIATE | Partial Approval | need to seal all pipe penetrations through bottom plate of wall rodent proofing with an approved product for example mortar Furthermore framing was approved already but should’ve only been inspected at the same time as MEP Customer agreed to call all MEP‘s and framing at same time |