Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2019 | PLUMBING - INTERMEDIATE | Approved | still need to figure out a way to secure the closet flanges. Also recommend putting some kind of dry pack or slurry mix under the tub as it’s floating 3 inches above the floor | |
| 04/18/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall provide (3) sided blocking on forced air vent. 2- Can not have two traps on one trap arm. Shall provide a drain for one lavatory then wet vent the second lavatory. 3- Shall provide Sanitary Tees not Combination Tee Wyes on a vertical position to pick up the fixture trap arms. 4. Shall secure the closet rings to the floor. 5- Shall provide a minimum of 18 inches of copper to the pex adapter fitting at water heater supply lines. |
|
| 04/17/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | work is not complete, too many items to list. | |
| 04/15/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Gas, DWV, and water piping test only. 1-Kitchen clean out needs to extend outside of lath. 2-Kitchen vent horizontal offset is not six inches above flood level rim. 3-Provide test for roof leaders |