Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2018 | ELECTRIC - FINAL | Approved | ||
| 11/09/2018 | ELECTRIC - FINAL | Partial Approval | drawings call for a 50 amp solar breaker and a 60 amp is currently installed. Roof portion okay. |