Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T18CM06022
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2020 | FIRE - ALARM FINAL | Approved | ||
06/22/2020 | FIRE - ALARM FINAL | Partial Approval | 1. Waiting on As-builts. | |
06/10/2020 | FIRE - ALARM FINAL | Partial Approval | 1) Lack of notification in NE corner, last phase. Notification not installed per plans. Resolve and submit as-builts. As-builts need to reflect actual installation. | |
06/01/2020 | FIRE - ALARM FINAL | Partial Approval | 1. Submit As-builts. 2. Will need to sync horn/strobes in showroom and lobby. 3. Need to installl cell dialer. |
|
03/24/2020 | FIRE - ALARM FINAL | Partial Approval | These are notes from alarm permit: 1) Need notification installed in conference room and breakroom. Accordian door to remain open until phase 2 notification added in breakroom. 2) Add smoke detector above FACP 3) Signals were tested with phone lines. Cell dialer to be finaled. All signals need to be retested once communicator is on line and phone lines disconnected. 4) Resolve notification issues in "parts." Not working. 5) Submit as-builts. It's possible notification will need to be added in service bays since devices not installed per plans. 6) Notification needs to be installed in service bays. 7) Reinspection fees after second inspection. 8) Notification still needs to be added in E-Comm for phase 1. |