Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2019 | ELECTRIC - UNDERGROUND | Approved | ||
| 04/16/2019 | ELECTRIC - UNDERGROUND | Partial Approval | Continuing with north side underground conduits - 4 - 4” east to pull box and south 30’ . 3 - 4” spares for future also run in trench. | |
| 04/10/2019 | ELECTRIC - UNDERGROUND | Partial Approval | 4 - 4" underground conduits from ses to n.e. Corner sidewalk ok to backfill. Conduit and boxes in retaining wall ok. |
|
| 03/19/2019 | ELECTRIC - UNDERGROUND | Partial Approval | Stem Wall east side of mezzanine | |
| 03/08/2019 | ELECTRIC - UNDERGROUND | Partial Approval | 11 Conduits in stem wall and same footing listed above |