Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T18CM05941
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
04/10/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Retaining wall, east of sanctuary, ok to pour. | |
03/21/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Pad for high school worship area | |
03/19/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Stem Wall east side of mezzanine, footing and steel and pad | |
03/08/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | West mezzanine footing with 2 #5 bottom 1 #4 top with #4 48" oc | |
03/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 8 boxes/footings with rebar for columns 5 footers with rebar for pad pour |
|
03/06/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 5 additional column piers per plans changed from AP to PA per GWEST due to more work to be done |
|
03/05/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 3’ X 3’ Footings on east side #5 12" EW horizontal and 4# 5 verts with 2 #4 wraps | |
03/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 13 column bases with #5 Bert’s and 5#4 wrapped around per plan | |
03/01/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | High School Stage Wall Please open the 1005 line back up and call Bills AP a PA as lots of rebar to go |
|
02/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved |