Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2019 | FRAMING | Approved | ||
| 03/28/2019 | FRAMING | Not ready for Inspection | Walked with owner and workers to develop a to-do and Not to-do list. They will call back in soon |
|
| 03/18/2019 | FRAMING | Denied | 1-Finish drop ceilings. 2-Install and/or complete al. Fire blocking throughout. 3-seal fire-blocking throughout. 4-Drywall backing missing in many locations. |
|
| 12/21/2018 | FRAMING | Partial Approval | 1- Shall seal all top plate penetrations with fire rated foam or caulk. 2- Call in framing inspection with all intermediate inspections at the same time. |