Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2018 | ELECTRIC - CONSTRUCTION POWER | Approved | Main panel to be locked prior to being energized, and to remain until all plug, switch and fixtures are installed. ECO ok to clear. |