Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2020 | PLUMBING - ROUGH, SOIL | Approved | 3090 | |
| 05/01/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | Added 3” from 2 nd floor to 3” main at living quarters per as built all tests ok Per house bill 2256 green tracer wire required Contractor send photos of tracer wire installed Recall when mainline completed to HCS |
|
| 04/30/2019 | PLUMBING - ROUGH, SOIL | Cancelled | IVRS - AP canceled | |
| 04/29/2019 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | inspected section outside of footprint from south end of house to Y by second set of cleanouts. It appears that it was under test but not holding most of the ABS piping is empty. Also any portion of PVC piping not under slab needs a tracer wire. | |
| 04/26/2019 | PLUMBING - ROUGH, SOIL | Cancelled | IVRS - AP canceled | |
| 04/16/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | HOUSE STILL BEING BUILT, REQ SAME INSPECTION | |
| 11/21/2018 | PLUMBING - ROUGH, SOIL | Approved |