Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 06/04/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | Bottom of footings still not 12” in to undisturbed soil. 2-Reinforcing is still less than 3” from soil. | |
| 05/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Correction Required | 1- Reinforcing must be a minimum of 3" from soil. 2-Footings are less than 12" in to undisturbed soil in many places. 3-Plumbing must be sleeved at horizontal areas in footings and stem-walls. |