Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 10/30/2018 | PLUMBING - INTERMEDIATE | Denied | 1- Shall provide a clean out at the base of the 3 inch soil stack. 2- Re test the DWV System. |