Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 10/10/2018 | PLUMBING - INTERMEDIATE | Denied | 1- Approved plans call for 11/4 inch water supply to the water heater. 2- The rear hose bin shall be 3/4 inch in size all the way to the hose bib and is located in the wrong location. 3- Overhead water lines to close to the can lights. |