Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T18CM05573
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2019 | BUILDING - FINAL | Approved | ||
01/23/2019 | BUILDING - FINAL | Correction Required | Install breaker blank on electrical service dead front panel at missing breaker spot and one on front of service panel. Install permanent plastic, riveted on, permanent solar label on dead front panel. Riveted labels required on all solar related disconnect boxes and panels. Install sticker labels on all solar related EMT/Flex as required. No ladder on site. A “strapped” ladder is required for roof array layout and rack bonding/etc inspection. Put ladder as close to front array as possible. |