Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2019 | PLUMBING - FINAL | Approved | ||
| 02/26/2019 | PLUMBING - FINAL | Correction Required | Glue water heater drain pan pipe Install MB lavi faucets |
|
| 02/22/2019 | PLUMBING - FINAL | Correction Required | Master bathroom lavatories still not installed. |