Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 11/14/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1.A. Install cleanout at new to existing abs at front gate. B. Install balloon in new clean out and perform 10 foot head water pressure test on all knew abs and recall for inspection when full. 2. Install green 18 gauge tracer wire on all exterior abs. |