Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/06/2019 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 09/23/2019 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
Air pressure test provided on bldg. sewer and verified by other. |
| 09/20/2019 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
Work is incomplete |
| 08/21/2019 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
2 inch cast-iron piping for condensate venting under test and approved. |
| 08/20/2019 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
3 different runs of copper water supply and drain lines running to roof top units under 60 psi of water pressure, no leaks |
| 06/26/2019 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
2 FDC riser pipes in NW corner of building, single piece of pipe with 90° corner underground, no joints below grade inside building, will be pressure tested once complete, thrust blocks at 90 °corner were formed up ready to pour at inspection |
| 06/05/2019 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
Contractor need to call in for 3037 |