Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T18CM05426
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | approval is for remaining pour back strip 30’ near large opening SE corner, and remaining 150’ from fire riser room south. | |
06/26/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Closure pour for west side, from last overhead door to 10’ south of FDC risers in NW corner, ok for concrete placement | |
06/17/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Open line item up if closed as more to go. Rebar mat and dowels fro man door south to west wall ribbon north to north wall |
|
06/13/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | this appears to be for the pour back strip along the west side of the building. Clearances not maintained, clean up debris, complete work on PVC piping and backfill, missing formwork on northern side. Need to see detail on drawing Jobsite trailer locked up at 10am. | |
06/12/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Slab closure pour: East side of building between Grid 2 to 13 and Grid 14 to 15 and south end between Gird A to D.5 and dock levelers floor only along west side of building. Ok to pour, clean trash from area before placement and epoxy missing rebar in tilt planes in southeast corner. Special inspection will need to be done for epoxy installed rebar. | |
03/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Tilt panels 3 thru 13 ok to pour | |
01/31/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GL A 15 ok to pour | |
01/30/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GL F from 9-15 & GL 15 from E-F per detail 2/S2.0 See highlighted S1.0 & S1.1 plan |
|
01/29/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | from grid lines 1 through 10 on F West side. From grid lines 8 through 10 on A Eastside. See highlighted drawing on site | |
01/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Footing on North side and East from grid lines 1-8 | |
01/23/2019 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | all interior spot footings OK |