Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2020 | PLUMBING - INTERMEDIATE | Approved | ||
| 02/07/2020 | PLUMBING - INTERMEDIATE | Denied | 1- Shall locate the vents for the Shower and Tub above the center line of drain. 2- Shall provide approved material for straying and blocking of all horizontal waste and soil lines. 3- Shall seal all second floor openings with fire rated foam or caulk. 4- Shall provide (3) sided blocking on all forced air vents. |