Permit: T18CM05211

Parcel: 115211520

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T18CM05211

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/26/2019 BUILDING - FINAL Approved
02/25/2019 BUILDING - FINAL Denied 1- Shall provide a water drip pan under the water heater and provide a drain.
2- Shall provide a minimum of 1 inch air gap on all indirect waste lines and secure them in an approved manor.
3- Shall provide a larger permanent label for the Anzul valve location.
4- Shall caulk the mop sink.
5- Shall provide a lock out tag out clip on the dedicated circuit breaker for the water heater.
01/28/2019 BUILDING - FINAL Denied I- Shall provide a GFCI receptacle at the mop sink.
2- Shall caulk all fixtures.
3- Shall provide a vacuum breaker on the Ice Machine and Pasta Cooker supply line.
4- Shall post the unit number on the door or space.
5- Shall expose the water heater in the ceiling.
6- Shall provide a indirect waste line for each compartment at the triple compartment sink.
7- Shall label the automatic gas shut off valve on ceiling tile.