Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18CM05198

Parcel: 14002010A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T18CM05198

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
01/29/2019 EXCAVATION/LAYOUT REBAR & ZON Approved Line 21 B&C 18" OC 2 Matts #7
Line D #7 18" OC 2 Matts
Line C #5 18" OC 2 Matts
Line B #5 18" OC 2 Matts
Line A #7 18" OC 2 Matts
01/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Lines A & D #7 18"OC 2 Matt’s
Lines B & C #5 18"OC 2 Matt’s
Line 21 B &C #7 18" OC 2Matts
01/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line 8 #7 EW 18" OC (All are constructed with 2 Matts)
6 thru 21 Footings
Line D 6 #7 EW 18" OC
6 thru 18 Footings
01/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Footings per Plan include, A1 thru A5 and D2 thru D6 All are constructed with 2 matts #7 18" OC EW