Permit: T18CM05196

Parcel: 14002010A

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
06/09/2020 EXCAVATION/LAYOUT REBAR & ZON Approved
10/23/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Bldg 4. Line 1.8 - c footing ok to pour
10/22/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line 1 - a , b, d e ok to pour
10/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Bldg 4

Grid line A Footings 18,19,20,26.

Bldg 4

Pedestals Grid line 20E,19E,18E,17E,16E,15E,14E,13E.

OK to pour.
10/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL E. 5 - 13. And. GL A. 5 - 23. Ok to pour column footings.
10/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval E line 14 through 21 ok to pour on bldg #4