Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2019 |
ELECTRIC - FINAL |
|
Approved |
OK to clear solar DGC |
| 06/05/2019 |
ELECTRIC - FINAL |
|
Partial Approval |
roof portion OK. Equipment is not ready, missing labels, missing solar breaker, disconnect not even wired, combiner panel is in a different location than drawing, May require a secondary disconnect if some equipment is on other side of the fence and not per drawing. |
| 04/02/2019 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
still pending crossover. Previous INCR clearance already turned in. Also pending solar portion. If solar portion is ready for inspection please have equipment accessible in the backyard along with a ladder set up and secured to inspect roof portion. |
| 03/08/2019 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
property is fenced in and clear signs of dogs on property. I don’t see a ladder set up. No message left for inspector. Called The contractor and left a message with the secretary. |