Permit: T18CM04900

Parcel: 118051370

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
06/10/2019 BUILDING - FINAL Approved
06/05/2019 BUILDING - FINAL Partial Approval roof portion OK. Equipment is not ready, missing labels, missing solar breaker, disconnect not even wired, combiner panel is in a different location than drawing, May require a secondary disconnect if some equipment is on other side of the fence and not per drawing.
04/02/2019 BUILDING - FINAL Not ready for Inspection still pending crossover. Previous INCR clearance already turned in. Also pending solar portion. If solar portion is ready for inspection please have equipment accessible in the backyard along with a ladder set up and secured to inspect roof portion.
03/08/2019 BUILDING - FINAL Not ready for Inspection property is fenced in and clear signs of dogs on property. I don’t see a ladder set up. No message left for inspector. Called The contractor and left a message with the secretary.