Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2018 | ELECTRIC - FINAL | Approved | DGC | |
| 12/17/2018 | ELECTRIC - FINAL | Partial Approval | previous corrections still need to be addressed. Still need gas and water bonds. Still need ladder set up and secured for solar inspection. Still need drawings on site at time of inspection. No contact number or message left. Another failed inspection will result in a reinspection fee. | |
| 12/04/2018 | ELECTRIC - FINAL | Partial Approval | previous Corrections from 11/9 still need gas water bonds. Need ladder set up and secured for solar inspection. Need drawings on site at time of inspection. | |
| 11/09/2018 | ELECTRIC - FINAL | Partial Approval | Bond gas and water lines pending solar install |