Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2018 | ENGINEERING - FINAL | Approved | ||
| 10/02/2018 | ENGINEERING - FINAL | Not ready for Inspection | THE CONTRACTOR IS NOT READY AT THIS TIME AND WILL BE RE-INSPECTED ON 10/3/18 FOR THE FINAL |