Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2019 | ELECTRIC - CONSTRUCTION POWER | Approved | TEP code is EC0 | |
| 02/08/2019 | ELECTRIC - CONSTRUCTION POWER | Correction Required | See gas line correction, gas line not on plans. Construction power requires a 20 amp GFI below panel, wired into panel and One breaker. Install a wet location box and approved cover. Install breaker n Blanks at open breaker positions. Bond the gas line stub coming out of wall for safety and as required by NEC |