Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2018 | PLUMBING - GAS PRESSURE TEST | Approved | CLEAR SW GAS | |
| 06/29/2018 | PLUMBING - GAS PRESSURE TEST | Denied | PRESSURE AT 8 LBS. PLEASE RE-PRESSURIZE TO 15 LBS SO INSPECTOR KNOWS WHERE IT STARTED. DO #S 1, 3, AND 5 FROM PREVIOUS CORRECTION LIST. |
|
| 06/22/2018 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- GAS PRESSURE TEST WAS DOWN, CHECK THE SYSTEM FOR LEAKS. 2- SHALL PROVIDE A GAS BOND ON THE GAS LINE. 3- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR LOCATED IN THE HALLWAYS TO THE BEDROOMS OR AS CLOSE TO THE WATER HEATER AND FURNACE LOCATION. 4- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT AND AT THE WATER HEATER DRAFT COLLAR AND VENT CONNECTOR. 5- SHALL PROVIDE A OPEN FIXED POSITION METHOD FOR THE FIREPLACE FLU VENT DAMPER. 6- SHALL PROVIDE SEDIMENT TRAPS FOR THE WATER HEATER AND FURNACE GAS SUPPLYS. * |