Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2018 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/26/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ||
| 06/22/2018 | PLUMBING - INTERMEDIATE | Denied | NEED TO HAVE WATER IN SYSTEM AT TIME OF INSPECTION | |
| 06/20/2018 | PLUMBING - INTERMEDIATE | Denied | PLEASE HAVE WATER PRESSURE IN LINE TO MAKE SURE IT PASSES TEST | |
| 06/19/2018 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A MISSION SPECIALTY COUPLING AT THE MASTER BATH LAVATORY DRAIN WHEN CONNECTING DISSIMULAR MATERIALS. 2- SHALL PROVIDE A DOUBLE FIXTURE FITTING FOR THE DOUBLE LAVATORIES IN THE MASTER BATH. * |