Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2018 | ELECTRIC - SERVICE UPGRADE | Approved | Went out a solar only and found a Service Power Upgrade that had a power kill in the AM. Discussed with Bruce at COT. I added the line item for Service Panel Upgrade-2065. I gave meter clearance for TEP + INCR, Done! 125AMP, Like for Like. PM&M was told to upgrade permit with COT before calling out the solar install and panel upgrade for Final. |