Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2018 | PLUMBING - FINAL | Approved | before Southwest Gas shows up fix B venting on both front and back units, missing correct connections do not use tape use screws 3 per joint. Gas clearance turned into Southwest Gas. Please close out this permit. |
|
| 09/28/2018 | PLUMBING - FINAL | Not ready for Inspection | no access and no code or message left for lock box. | |
| 06/07/2018 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1- GAS PRESSURE TEST PROVIDED. 2- SHALL PROVIDE A GAS BOND. 3- SHALL CONNECT ALL GAS APPLIANCES AND CALL FOR FINAL INSPECTION TO XCLEAR THE GAS METER. |