Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: SEWER - PRE CONSTRUCTION MTG
Permit Number - T18CM04241
Inspection Description - SEWER - PRE CONSTRUCTION MTG
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/31/2018 | SEWER - PRE CONSTRUCTION MTG | Partial Approval | Force main inspection for Serrano Vista Trail- Lots141-157 | |
08/30/2018 | SEWER - PRE CONSTRUCTION MTG | Approved | MET WITH ROBERT TO INSPECT FORCEMAINE PIPING AND EXCAVATION. PIPE TYPE WAS 4" HPD WITH FUSED JOINTS. THE PIPE WILL BE INSTALLED AT6' IN DEPTH BETWEEN GRAVITY MAINS AT SUBDIVISION, UNTIL ALL GRAVITY IS INSTALLED. | |
08/28/2018 | SEWER - PRE CONSTRUCTION MTG | Approved | Manholes, 18 & 19. Sewer connections 133, 134, 135, 136 and 137 | |
08/22/2018 | SEWER - PRE CONSTRUCTION MTG | Approved | Street-Serrano Wash Trail-The whole street done-Sewer AP 8-22-2018 | |
07/05/2018 | SEWER - PRE CONSTRUCTION MTG | Approved | Met w/ Robert. Manholes 7-20 and 20-21, sewer line. | |
06/20/2018 | SEWER - PRE CONSTRUCTION MTG | Approved | MET WITH ROBERT ON SITE FOR PRE-CONSTRUCTION | |
06/19/2018 | SEWER - PRE CONSTRUCTION MTG | Not ready for Inspection | MEETING ON WED WITH ROBERT FROM BORDERLAND 8-830 |