Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date |
Description |
Inspector |
Results |
Comments |
| 04/26/2019 |
ELECTRIC - CONSTRUCTION POWER |
|
Approved |
approved upon 2090 approval |
| 11/20/2018 |
ELECTRIC - CONSTRUCTION POWER |
|
Denied |
Need moisture barrier behind panel. |
| 11/19/2018 |
ELECTRIC - CONSTRUCTION POWER |
|
Cancelled |
IVRS - AP canceled |
| 11/16/2018 |
ELECTRIC - CONSTRUCTION POWER |
|
Partial Approval |
NEED GFCI INTALLED ON THE PANEL WITH WEATHER PROOF COVER, NEED BREAKER INSTALLED FOR GFCI, NEED ADDRESS LABEL. CLEARANCE WAS SENT INTO PDSD CLEARANCES 11/16 AHEAD OF INSPECTION DUE TO AN ERROR THAT PARTIAL APPROVAL WAS SUPPOSED TO BE SENT IN AND FULL APPROVAL WAS GIVEN. |
| 10/19/2018 |
ELECTRIC - CONSTRUCTION POWER |
|
Approved |
need GFCI installed at panel with weatherproof cover. Need breaker installed for GFCI below panel. Need address label on panel |