Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/01/2019 |
ELECTRIC - ABOVE CEILING |
|
Approved |
|
| 02/12/2019 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
1- MC cable and metal boxes in walls in all rooms on the first floor and corridor from South end of corridor up to the elevator vestibule only. |
| 01/22/2019 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
|
| 01/10/2019 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
Corridors on floors two through five |
| 12/04/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
all of second floor and fifth floor studio |
| 11/14/2018 |
ELECTRIC - ABOVE CEILING |
|
Partial Approval |
Third floor guest rooms only |