Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2020 | ELECTRIC - FINAL | Approved | There is a letter from Desert View System stating that the electric meets the 2017 NEC code. |
|
| 03/25/2020 | ELECTRIC - FINAL | Denied | A letter from the contractor is required stating that the electric meets the 2017 NEC code. |