Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2018 | ELECTRIC - FINAL | Approved | okay to clear solar dgc. | |
| 09/26/2018 | ELECTRIC - FINAL | Correction Required | Recomend a new service panel PV plans call for 25 amp breaker service enclosure has a 45 amp Install a breaker blank at missing breaker spot Simultaneous breaker switch lever-Listed? Broken off switch lever on breaker-replace breaker |