Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2018 | MECHANICAL - INTERMEDIATE | Approved | Per Kyrstal, dispatcher Cheryl, closed this permit on 9/18/18 because 4090 mechanical final was approved on 9/17/18 by Mr. E. Stevens. | |
| 08/23/2018 | MECHANICAL - INTERMEDIATE | Denied | DISCONNECTS ARE REQUIRED AT ALL UNITS. | |
| 07/13/2018 | MECHANICAL - INTERMEDIATE | Denied | 930 am inspection for Amy. Ladder is too short to access condensers, but I was able to get a closer look at the condensers and piping; Condensing units are not properly secured to structure, and the PVC joints are separating. Secure roof top units, solvent cement all joints. Provide safe access to all work. Amy suggested that I was adding corrections to the list and requested a supervisors name and number. I gave her Dave Roberts because Bruce and Arm are absent. |
|
| 06/29/2018 | MECHANICAL - INTERMEDIATE | Denied | No MSG, no one on site. Provide access to all areas, support all pipes, tubing and conduits. Correct condensate terminations |
|
| 06/19/2018 | MECHANICAL - INTERMEDIATE | Denied | No MSG, no one on site. Provide access to all areas, support all pipes, tubing and conduits. Install flASHINGS at any roof penetrations. * |