Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2018 | PLUMBING - FINAL | Approved | ||
| 06/15/2018 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- GAS PRESSURE TEST PROVIDED. GAS BOND PROVIDED. 3- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON VENT CONNECTOR AND WATER HEATER DRAFT COLLAR. 4- SHALL PROVIDE A FIXED OPEN METHOD FOR THE FIREPLACE FLU DAMPER. * |