Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2020 | PLUMBING - GAS PRESSURE TEST | Approved | Clear gas meter Verbal clearance called in at 11:20 am. |
|
| 03/25/2020 | PLUMBING - GAS PRESSURE TEST | Denied | Shall run and terminate each regulator vent independently to the outdoors. | |
| 03/11/2020 | PLUMBING - GAS PRESSURE TEST | Denied | 1- Shall provide approved approved material for the gas regulators vents. 2- Shall verify gas bond on system. 3- Shall provide a minimum of 5 feet of B-Vent for the water heater. 4- Shall provide a minimum of 1 inch of annular space around the water heater flu vent. 4- Shall extend and terminate the water heater t & p drain to daylight. 5- Shall test the entire system. 6- Shall complete all equipment exhaust vents through roof. 7- Shall final connect all equipment at time of inspection request. Inspection stop. There could be more code violations, check all existing appliances and equipment. |