Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2018 |
ELECTRIC - FINAL |
|
Approved |
ok to clear solar, dgl |
| 12/19/2018 |
ELECTRIC - FINAL |
|
Partial Approval |
no solar breaker in main panel. Revised drawings show 100 amp breaker which doesn’t make sense for the size of the system. Don’t see 100 amp fused disconnect on the equipment page. Older equipment page makes sense but that’s not the set up. Left a voicemail for Randy about the confusion who was the contact number on inspection sheet. |