Permit: T18CM03581

Parcel: 10510062G

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T18CM03581

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
08/23/2018 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
08/16/2018 PLUMBING - INTERMEDIATE Denied ALL WALLS HAVE DRYWALL. UNABLE TO SEE PLUMBING
06/20/2018 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999
1- SEE NOTE FROM PREVIOUS INSPECTION.
2- NO DWV WATER TEST.
3- REMOVE ALL EXISITING P-TAPE ON THE HORIZONTAL VENT AND PROVIDE APPROVED HANGERS OR STRAPS.
4- VET FOR RESTROOM LAVATORY NO CONNECTED.


*
06/19/2018 PLUMBING - INTERMEDIATE Partial Approval Hand written per Bruce, no super on site.
Install backing at MS, Lavatory carrier and pipe insulation.
06/08/2018 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/31/2018 PLUMBING - INTERMEDIATE Not ready for Inspection not under test
MS dry vent shall rise in a vertical direction to above fixture flood level prior to horizontal offset