Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2018 | PLUMBING - FINAL | Approved | ADD ARRESTER ON COLD WATER AS WELL AT THE WASHER | |
| 08/13/2018 | PLUMBING - FINAL | Correction Required | 3 Tech screws required at water heater vent conn to B vent, Smitty pan required or run P&T to outside the house, B vent to meet 1" separation from ceiling combustibles per manufacturer. | |
| 08/06/2018 | PLUMBING - FINAL | Partial Approval | 1. UPPER SUB-PANEL GFI BREAKER WON'T TRIP. 2. NEED COVERED BULBS IN CLOSETS. 3. INSTALL ARC FAULT BREAKERS WHERE NEEDED. |