Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2019 | PLUMBING - GAS PRESSURE TEST | Approved | (rvi) | |
| 09/03/2019 | PLUMBING - GAS PRESSURE TEST | Correction Required | Correction required. Must use 15 PSI gauge, bond gas and water to EGC. | |
| 06/17/2019 | PLUMBING - GAS PRESSURE TEST | Denied | Provide 15 pound gauge at 10 psi Provide an approved gas diagram for a gas line sizing. All new work work may have to be exposed for inspection. Bond a gas line |
|
| 05/24/2019 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | 1- Work is incomplete.Shall call for all intermediate inspections at one time. |