Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 02/08/2019 | PLUMBING - INTERMEDIATE | Correction Required | Install shower pan and closet ring. Fill pan with water to pan edge Fill system with water through roof (VTR) for peak test. Fill water lines, hot and cold with working water pressure for test. 18” of copper req at per termination at water heater. |