Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2018 |
BUILDING - FINAL |
|
Approved |
|
| 07/16/2018 |
BUILDING - FINAL |
|
Correction Required |
2 ground rods required, gas bond and water bond. Electrical contractor needed here to get all panel grounding and bonding straightened out. Keep all Rods and bonding exposed until after inspection so we can find and see all required. |
| 06/19/2018 |
BUILDING - FINAL |
|
Correction Required |
Electrical service panel is new with seperate old/existing meter socket box. Panel requires-2 Grounding Rods or proof of approved UFER per NEC, Gas bonding and water pipe bonding are required. 36" of clearance required in front of service and solar electrical equipment. |