Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2018 | FRAMING | Approved | ||
| 09/14/2018 | FRAMING | Denied | 1. TOILET FLANGES NEED TO BE SECURED TO CONCRETE 2.SEPARATION OF VENTS IN GARAGE ON WEST SIDE BY WATER HEATER NEEDS TO BE INSTALLED |