Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 06/21/2018 | PLUMBING - INTERMEDIATE | Denied | 1- SHALL PROVIDE A SAN TEE FOR THE URINAL TRAP ARM AT THE SECOND FLOOR URINAL. 2- SHALL PROVIDE THE REQUIRED SHIELD PLATES LOCATED AT THE TOP AND SOLE PLATES FOR PIPE PROTECTION. 3- RETEST THE SYSTEM. |
|
| 06/20/2018 | PLUMBING - INTERMEDIATE | Cancelled | IVRS - AP canceled | |
| 06/19/2018 | PLUMBING - INTERMEDIATE | Partial Approval | 2ND FLOOR SECTION DWV IS NOT UNDER TEST. | |
| 06/08/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 06/06/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection |